Purpose of this change

This proposal is for a permanent change concerning the implementation of a GNSS Instrument Approach Procedure Without Approach Control, for which a scaled airspace change process applies and the change level is 3. The detailed process requirements are published in CAP1961.

Benbecula Airport is currently served by IAPs relying on conventional navigational aids (BBA NDB and BEN DVOR). The DVORs at BEB were to be rationalised (removed from service), by December 2019. NERL have mitigated the delay to await the approval of RNP procedures by extending the operational use of DVOR at BEB until 31st December 2023.

The introduction of RNP IAPs are an essential measure at Benbecula to cater for the DVOR rationalisation programme, together with the unreliable nature of the NDB, to provide IAPs to life-line services to the island community. RNP are the means by which HIAL aim to support the CAA future airspace and PBN aspirations.

Close

Stage 3 : Consult/Engage

This step has been started

At Stage 3 the change sponsor conducts targeted engagement activity so that relevant stakeholders' views are considered and taken into account. The extent of engagement required will depend on local circumstances and the scale and impact of the airspace change proposal.

CAA response to Stage 3

26/04/2024: The CAA has completed a review of the Stage 3 outputs and is satisfied that the change sponsor has met the requirements of the process up to this point. The CAA is content for the change sponsor to execute their engagement strategy.

Close

Documents for this proposal (8 documents)

Benbecula Airport Engagement Strategy & Material (3.3MB PDF)

Stage 3 - Consultation Strategy

Date added: 03 May 2024

Stage 2 Submission Document Version 3.0 (1.5MB PDF)

Stage 2 - Design Options

Date added: 06 March 2024

Stage 2 Submission Document Version 2.0 (1.4MB PDF)

Stage 2 - Design Options

Date added: 06 March 2024

Stage 2 Submission Document (1.6MB PDF)

Stage 2 - Design Options

Date added: 31 January 2024

Assessment Meeting Minutes (188.5kB PDF)

Stage 1 - Assessment Meeting Minutes

Date added: 30 October 2023

Assessment Meeting Presentation (358.0kB PDF)

Stage 1 - Other

Date added: 30 October 2023

Assessment Meeting Agenda (44.2kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 02 October 2023

Statement of Need (78.7kB PDF)

Stage 1 - Statement of Need

Date added: 27 April 2023

Close