Purpose of this change

This proposal is for a Temporary change to the notified airspace design, for which a scaled airspace change process applies and a change level is not applicable.

Virgin Orbit is a launch company headquartered in the United States with presence in the United Kingdom. Virgin Orbit is an air launch system that carries (also called captive carry phase of flight) an orbital rocket under the wing of a Boeing 747 to a site where the rocket (LauncherOne) ignites its engine and navigates to space. LauncherOne is an expendable, two-stage rocket designed to launch small satellites into a variety of Low Earth Orbits (notionally 300 kg to a 500 km sun-synchronous orbit (SSO)). L1 offers a payload fairing capable of accommodating a variety of standards for one or multiple spacecraft and a simple design that increases reliability while keeping launch cost low. Rather than launching from ground level, LauncherOne is carried to an altitude of approximately 35,000 feet by a 747-400 carrier aircraft (tail number N744VG).

LauncherOne drop locations and trajectories will vary based on payload requirements to meet specific orbits. The requested captive carry portion of the mission will start at Spaceport Cornwall with a flight path west over the ocean. The first launch is slated for June 2022 with additional launches anticipated at 1-2 per year up to 12 per year depending on demand.

The first flight from Spaceport Cornwall will be a one-time trajectory and therefore VO is requesting a Temporary ACP. The temporary ACP will address a danger area that is located approximately 135nmi west of Spaceport Cornwall. The area size is approximately 73nmi by 73nmi. Once the 747 arrives in the area, VO is requesting segregated airspace for 1 hour. 30 minutes of this time would account for the launch window and the additional 30 minutes would be allocated to account for fall time of the stage 1 and fairing back to the surface. Virgin Orbit is working to analyze if a 30-minute debris fall time can be scaled back as this is a conservative number.

Once the rocket is dropped from the aircraft and proceeds downrange along the trajectory, a danger area will be required during the initial phase of the flight to account for probability of failure. This area is approximately 310nmi in length by 35nmi in width at the widest point. A separation event will occur off the coast of Portugal downrange from drop. The Stage 1 and Fairing of the rocket will separate from Stage 2 and fall to the ocean. An additional danger area will be located at this point of ocean splashdown.

Close

Step 6b : Implement (Extension)

This step has been started

At Step 6b, the change sponsor may request an extension, which will be considered by the CAA.

Documents for this proposal (15 documents)

Virgin Orbit (South) - Stage 5 Temporary ACP Decision Log (314.2kB PDF)

Decide Gateway - Gateway Decision

Date added: 09 January 2023

Virgin Orbit (South) - Stage 5 Temp ACP Engagement Assessment (243.9kB PDF)

Decide Gateway - Other

Date added: 09 January 2023

Virgin Orbit (South) - Stage 5 Temp ACP Environmental Statement (110.0kB PDF)

Decide Gateway - Other

Date added: 09 January 2023

Virgin Orbit (South) - Stage 5 Temp ACP Operational Assessment (434.0kB PDF)

Decide Gateway - Other

Date added: 09 January 2023

Virgin Orbit (South) - Supplementary Decision AIC Extension (143.9kB PDF)

Decide Gateway - Gateway Decision

Date added: 06 January 2023

Virgin Orbit (South) - Stage 5 Airspace Limited Decision Log (326.4kB PDF)

Decide Gateway - Gateway Decision

Date added: 06 January 2023

Virgin Orbit (South) - Limited Operational Assessment (161.1kB PDF)

Decide Gateway - Other

Date added: 06 January 2023

Virgin Orbit Operations from Spaceport Cornwall V4.0 (15.8MB PDF)

Step 4 - Airspace Change Proposal

Date added: 18 November 2022

Virgin Orbit Operations from Spaceport Cornwall V2.0 (1.1MB PDF)

Step 4 - Consultation Document

Date added: 01 April 2022

Virgin Orbit Operations from Spaceport Cornwall (1.5MB PDF)

Step 4 - Consultation Document

Date added: 23 November 2021

Statement of Need Version 2 (332.1kB PDF)

Step 1 - Statement of Need

Date added: 07 October 2021

ACP Assessment Meeting Minutes Redacted (430.4kB PDF)

Step 1 - Assessment Meeting Minutes

Date added: 06 October 2021

Assessment Meeting 1 Agenda (141.7kB PDF)

Step 1 - Assessment Meeting Agenda

Date added: 11 August 2021

Statement of Need (192.4kB PDF)

Step 1 - Statement of Need

Date added: 11 August 2021

ACP Assessment Meeting #1 (5.0MB PDF)

Step 1 - Other

Date added: 11 August 2021

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close