Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is 2.

This statement of need confirms the essential State operational requirement that will be addressed by Bristow Helicopters Limited (BHL) utilising unmanned aircraft systems (UAS) deployed from Lydd London Ashford Airport.

Bristow Helicopters Limited have been requested by the Maritime and Coastguard Agency to submit an Airspace Change Proposal to facilitate long-term UAS Beyond Visual Line Of Sight (BVLOS) operations in the vicinity of the English channel. These routine HMCG patrols are required to support Search and Rescue taskings as a result of the increasing demand on emergency services responding to migrant crossings.

The forecasted duration of the requirement will require a permanent change to airspace. If in the future the requirement no longer exists, the airspace will be relinquished.

Close

Stage 3 : Consultation/Engagement Preparation

This step has been started

At the beginning of Stage 3 the change sponsor prepares a strategy and draft materials and submits them to the CAA, along with the full options appraisal.

CAA response to Stage 3

The revised airspace change process (CAP 1616, Version 5) will be implemented on 02 January 2024. This ACP will subsequently be reallocated from a Level 2b to a Level 2 and will need to follow the process requirements as set out in CAP 1616 Version 5.

Close

Documents for this proposal (29 documents)

Options Appraisal CAA Assessment (1.2MB PDF)

Stage 2 - Options Appraisal Assessment (Phase I - Initial)

Date added: 16 November 2023

Stage 2B Options Appraisal (Rev2 ) (6.7MB PDF)

Stage 2 - Options Appraisal Assessment (Phase I - Initial)

Date added: 13 November 2023

Stage 2A Design Options (Rev 2) (14.5MB PDF)

Stage 2 - Design Options

Date added: 13 November 2023

Stage 2B Options Appraisal (7.3MB PDF)

Stage 2 - Options Appraisal Assessment (Phase I - Initial)

Date added: 13 October 2023

Design Principle Evaluation (Rev 1) (771.6kB PDF)

Stage 2 - Design Principle Evaluation

Date added: 12 September 2023

Stage 2A Design Options Refinement Rev 1 (14.5MB PDF)

Stage 2 - Design Options Engagement Evidence

Date added: 08 September 2023

Amended Timeline (204.4kB PDF)

Stage 2 - Timeline Agreement

Date added: 08 September 2023

Stage 2 Update (91.8kB PDF)

Stage 2 - Other

Date added: 03 May 2023

Stage 2A Design Principle Evaluation (743.6kB PDF)

Stage 2 - Design Principle Evaluation

Date added: 28 February 2023

Stage 2A Design Options Refinement (14.4MB PDF)

Stage 2 - Design Options Engagement Evidence

Date added: 28 February 2023

Stage 2A Design Options (1.3MB PDF)

Stage 2 - Design Options

Date added: 28 February 2023

Stage 2A Design Options (1.4MB PDF)

Stage 2 - Design Options

Date added: 23 December 2022

Stage 2A Design Options (2.1MB PDF)

Stage 2 - Design Options

Date added: 21 December 2022

Stakeholder Feedback Post Stage 1B Engagement period -Redacted (1.6MB PDF)

Stage 2 - Engagement Evidence

Date added: 13 December 2022

Stakeholder Communications (12.3MB PDF)

Stage 1 - Engagement Evidence

Date added: 18 November 2022

Stakeholder Engagement Strategy (1.5MB PDF)

Stage 1 - Other

Date added: 18 November 2022

Stakeholder Engagement Letter (1.1MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 18 November 2022

Stakeholder Engagement Document (Design Principles) (1.1MB PDF)

Stage 1 - Design Principles

Date added: 22 September 2022

Agreed Timeline Amendment (258.0kB PDF)

Stage 1 - Timeline Agreement

Date added: 21 September 2022

20220801-Stage 1 Outcome CAA Statement (115.4kB PDF)

Define Gateway - Engagement Evidence

Date added: 02 August 2022

Stage 1B - Stakeholder Communications -Redacted (3.1MB PDF)

Stage 1 - Engagement Evidence

Date added: 20 July 2022

Stahe 1B Draft Design Principles (version 3) redacted (674.5kB PDF)

Stage 1 - Design Principles

Date added: 20 July 2022

Stakeholder Engagement letter (Design Principles) (500.6kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 08 June 2022

Amended ACP timeline (Agreed) (184.4kB PDF)

Stage 1 - Timeline Agreement

Date added: 17 May 2022

Agreed ACP Timeline (182.3kB PDF)

Stage 1 - Timeline Agreement

Date added: 01 March 2022

Assessment meeting minutes (189.4kB PDF)

Stage 1 - Assessment Meeting Minutes

Date added: 28 January 2022

Statement of Need V2 (131.6kB PDF)

Stage 1 - Statement of Need

Date added: 28 January 2022

Assessment meeting agenda (49.3kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 05 January 2022

Statement of Need (92.7kB PDF)

Stage 1 - Statement of Need

Date added: 05 January 2022

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close