Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is 0.

Removal of HARDY 5M 5V SID from the AIP. As part of the dependency impact assessment of withdrawal of 30 DVORs and NDBs it was concluded that the most appropriate mitigation for the RWY 26L/R HARDY 5M 5V SID was for it to be withdrawn from the AIP.

Close

Step 6 : Implement

This step has been started

During the Implement Step, the change sponsor implements the approved change, working with air navigation service providers as necessary.

CAA response to Step 6

Implemented AIRAC 12/2023

Close

Documents for this proposal (2 documents)

Assessment Meeting Presentation (1.1MB PDF)

Step 1 - Assessment Meeting Agenda

Date added: 26 September 2023

Statement of Need (69.4kB PDF)

Step 1 - Statement of Need

Date added: 26 September 2023

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close