Purpose of this change

This proposal is for an Applicability and Policy Alignment Check.

Following an Airprox in 2024, ANSL and the UK Airprox Board recommended that VRPs in the Edinburgh CTR be reviewed. Following the review, the change is requested to ensure that the KIRKNEWTON Visual Reference Point (VRP)

is differentiated from KIRKNEWTON AIRFIELD. A VRP is still required in that area for co-ordination and routing guidance even when Kirknewton airfield is not active.

The objective is to replace the existing KIRKNEWTON VRP (555315.00N 0032505.00W) with a new one at KIRKNEWTON RAILWAY STATION (555319.74N 0032601.54W).

The new VRP is situated approximately 0.5nm to the WNW of the existing VRP.

The key reason for the change is safety - to prevent confusion to airspace users and to facilitate clearer ATC instructions for transits across the Edinburgh CTR.

The other element is that the existing VRP does not effectively meet the requirements detailed in the policy statement for the establishment of VRPs in that it is not based upon a prominent ground feature.

Close

Stage 1 : Applicability and Policy Alignment

This step has been started

On receipt of a DAP 1916 Statement of Need, an Applicability and Policy Alignment Check (APAC) is undertaken by the CAA to ascertain whether the change falls in scope of the Airspace Change Process (CAP1616). The APAC must be conducted before the request can be promulgated in the UK Aeronautical Information Publication (UK AIP). If the APAC concludes that change does fall in scope of the Airspace Change Process, the sponsor will be advised the next steps accordingly. If the APAC concludes that the change does not fall in scope of the Airspace Change Process, the sponsor will be permitted to submit the change directly to the UK AIP Change Request Portal.

CAA response to Stage 1

20 June 2025: The CAA approves the implementation of this proposal. Implementation is scheduled for AIRAC 10/2025, which is effective on 2 October 2025.

Close

Documents for this proposal (4 documents)

Proposal Document v3.0 (1.4MB PDF)

Stage 1 - Other

Date added: 19 June 2025

Proposal Document V2.0 (1.4MB PDF)

Stage 1 - Other

Date added: 19 June 2025

Proposal Document (1.3MB PDF)

Stage 1 - Other

Date added: 19 June 2025

Statement of Need (756.1kB PDF)

Stage 1 - Statement of Need

Date added: 24 January 2025

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close