Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is 1.

This ACP will be used to implement any further changes that may be required by airport ACPs subsequent to LAMP2 Deployment 1.1. LD1.2 will be coordinated with the airports and the output from the airports may result in further changes as part of LD1.2. For example, network connection changes for any amended or new arrival/departure routes proposed by Bristol, Cardiff, or Exeter airports.

Close

Stage 3 : Consultation/Engagement Preparation

This step has been started

At the beginning of Stage 3 the change sponsor prepares a strategy and draft materials and submits them to the CAA, along with the full options appraisal.

CAA response to Stage 3

29/07/2021: Following the acceptance of ACOG’s pre-Stage 3 advice by the CAA and DfT, as co-sponsors of airspace modernisation, to split London Airspace Modernisation Programme 2 Deployment 1 into two separate proposals (see published documents ‘ACOG Pre Stage 3 Coordination Advice (Split LAMP 2 Deployment 1)’ and ‘CAA Acceptance of ACOG Pre Stage 3 Coordination Advice (Split LAMP 2 Deployment 1)’ , the CAA has reviewed the scaling level; confirmed at the Develop & Assess Gateway, for London Airspace Modernisation Programme 2 Deployment 1.2 (ACP-2021-050) has determined that this will remain as a level 1 ACP.

13/12/2023 - The revised airspace change process (CAP 1616, Version 5) will be implemented on 02 January 2024. This ACP will remain a Level 1 and will need to follow the process requirements as set out in CAP 1616 Version 5.

Close

Documents for this proposal (28 documents)

Indicative Timeline Update (132.4kB PDF)

Stage 3 - Timeline Agreement

Date added: 29 July 2021

Develop & Assess Gateway Outcome - 26 February 2021 (135.2kB PDF)

Develop and Assess Gateway - Gateway Decision

Date added: 22 July 2021

Acceptance of ACOG Pre Stage 2 Co-ordination Advice (170.9kB PDF)

Develop and Assess Gateway - Other

Date added: 22 July 2021

ACOG Pre Stage 2 Co-ordination Advice (442.3kB PDF)

Develop and Assess Gateway - Other

Date added: 22 July 2021

Initial Options Appraisal Assessment (369.7kB PDF)

Stage 2 - Options Appraisal Assessment (Phase I - Initial)

Date added: 16 July 2021

St2B Options Appraisal v2.1 (361.8kB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 16 July 2021

St2B Options Appraisal v2.0 (345.8kB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 16 July 2021

St2B Options Appraisal (309.3kB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 16 July 2021

St2A Design Options and Evaluation v2.0 (3.2MB PDF)

Stage 2 - Design Principle Evaluation

Date added: 16 July 2021

Timeline Change Approval (Stage 2 - March 2021) (129.7kB PDF)

Stage 2 - Timeline Agreement

Date added: 16 July 2021

Stage2 Engagement Evidence (4.1MB PDF)

Stage 2 - Design Options Engagement Evidence

Date added: 16 July 2021

St2A Design Options and Evaluation (3.2MB PDF)

Stage 2 - Design Options

Date added: 16 July 2021

Example St2 engagement presentation (12.6MB PDF)

Stage 2 - Design Options Engagement Evidence

Date added: 16 July 2021

Timeline Change Approval (126.7kB PDF)

Stage 2 - Timeline Agreement

Date added: 16 July 2021

Letter to Sponsor from CAA Airspace Modernisation (171.0kB PDF)

Stage 2 - Other

Date added: 16 July 2021

LAMP CAP1616 Compliance Meeting (739.2kB PDF)

Stage 2 - Other

Date added: 16 July 2021

Timeline (Redacted) (325.8kB PDF)

Stage 2 - Timeline Agreement

Date added: 16 July 2021

Deployment Plan Presentation (258.5kB PDF)

Stage 2 - Other

Date added: 16 July 2021

Design Methodology (452.9kB PDF)

Stage 2 - Other

Date added: 16 July 2021

Design Principles (546.8kB PDF)

Stage 1 - Design Principles

Date added: 16 July 2021

Assessment Meeting Minutes (412.3kB PDF)

Stage 1 - Assessment Meeting Minutes

Date added: 16 July 2021

Assessment Meeting Presentation (3.8MB PDF)

Stage 1 - Other

Date added: 16 July 2021

Assessment Meeting Agenda (564.9kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 16 July 2021

Revised Statement of Need (530.0kB PDF)

Stage 1 - Statement of Need

Date added: 16 July 2021

Initial Statement of Need (80.8kB PDF)

Stage 1 - Statement of Need

Date added: 16 July 2021

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close