Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is 3.

The recent change to the CAA policy statement for Transponder Mandatory Zones (TMZ) permits Electronic Conspicuity (EC) devices, other than Mode-S transponders, to be mandated within a TMZ. This ACP has two aims:

1. To establish an ADS-B based TMZ in the existing Land's End RMZ. This has the potential to improve safety for all airspace users by:

i) Providing an improved traffic picture for ATC (using Flight Information Displays- FID’s)

ii) Providing an improved traffic picture for Pilots (aircraft equipped with ADS-B IN)

2. Subject to an approved and robust Safety Case, it could allow the integration of new aircraft, including Remotely Piloted Aircraft, which have the potential to improve the logistics and connection to the Isles of Scilly.

In summary, this ACP seeks to establish an ADS-B based TMZ to improve both the safety & operational benefits to ATC and airspace users and the potential to integrate Remotely Piloted Aircraft.

Close

Stage 3 : Consult/Engage

This step has been started

At Stage 3 the change sponsor conducts targeted engagement activity so that relevant stakeholders' views are considered and taken into account. The extent of engagement required will depend on local circumstances and the scale and impact of the airspace change proposal.

Documents for this proposal (7 documents)

Revised Timeline (289.2kB PDF)

Stage 2 - Timeline Agreement

Date added: 19 June 2024

Revised Timeline (120.2kB PDF)

Stage 2 - Timeline Agreement

Date added: 04 March 2024

Assessment Meeting Minutes (920.3kB PDF)

Stage 1 - Assessment Meeting Outputs

Date added: 08 January 2024

Timeline (136.2kB PDF)

Stage 1 - Timeline Agreement

Date added: 16 October 2023

Assessment Meeting Presentation (1.6MB PDF)

Stage 1 - Other

Date added: 18 April 2023

Assessment Meeting Agenda (47.0kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 19 March 2023

Statement of Need (75.6kB PDF)

Stage 1 - Statement of Need

Date added: 27 January 2023

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close