Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is TBC.

All the major airports surrounding Farnborough (including Heathrow, Gatwick and Southampton Airports) are participating in the FASI South programme and proactively coordinating their ACPs with NERL to modernise the airspace and improve the vertical and lateral profiles of their routes. The wide scale airspace upgrades planned for the LTMA through the FASI South programme present an opportunity to potentially improve CCO/CDO performance for Farnborough operations, reduce the volume of Controlled Airspace, create the capacity for efficient growth, appropriately manage the adverse effects of aircraft noise and to reduce CO2 emissions. To capitalise on the opportunity, Farnborough has decided to start a new ACP that is intended to align with the FASI South programme and help to deliver the airspace modernisation objectives.

Close

Develop and Assess Gateway

This step has been started

At the Develop and Assess Gateway, the CAA completes a regulatory assessment of the change sponsor's outputs and relevant supporting evidence to determine whether the airspace change process requirements of Stage 2 have been followed.

Documents for this proposal (22 documents)

Stage 2B Initial Options Appraisal V1.0 (75.6MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 27 September 2024

Stage 2B IOA Technical Appendix V1.0 (15.1MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 27 September 2024

Stage 2A Options Development V1.0 (5.0MB PDF)

Stage 2 - Design Options

Date added: 27 September 2024

Stage 2A Annex 1 Design Principle Evaluation V1.0 (411.4kB PDF)

Stage 2 - Design Options

Date added: 27 September 2024

Stage 2A Appendix A Stakeholder Engagement Material V1.0 (31.3MB PDF)

Stage 2 - Engagement Material

Date added: 27 September 2024

Stage 2A Appendix B Stakeholder Feedback V1.0 (4.0MB PDF)

Stage 2 - Engagement Evidence

Date added: 27 September 2024

Stage 2A Appendix C Engagement Log & Correspondence V1.0 (8.6MB PDF)

Stage 2 - Engagement Evidence

Date added: 27 September 2024

Stage 2A Appendix D - FAQ Document V1.0 (547.2kB PDF)

Stage 2 - Engagement Evidence

Date added: 27 September 2024

Indicative Timeline - March 2024 (210.9kB PDF)

Stage 2 - Timeline Agreement

Date added: 18 March 2024

Indicative Timeline - November 2023 (779.3kB PDF)

Stage 2 - Timeline Agreement

Date added: 06 November 2023

Design Principles Submission - Main Document - Version 2.0 (1.0MB PDF)

Stage 1 - Design Principles

Date added: 30 June 2023

Response to CAA Gateway Feedback (278.4kB PDF)

Define Gateway - Other

Date added: 07 June 2023

Design Principles Submission - Main Document (1.2MB PDF)

Stage 1 - Design Principles

Date added: 28 April 2023

Stage 1 - Design Principles - Appendices (15.2MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 28 April 2023

Indicative Timeline - January 2023 (205.8kB PDF)

Stage 1 - Timeline Agreement

Date added: 23 January 2023

Assessment Meeting Minutes (221.1kB PDF)

Stage 1 - Assessment Meeting Minutes

Date added: 17 November 2022

Assessment Meeting Presentation (318.8kB PDF)

Stage 1 - Other

Date added: 17 November 2022

Assessment Meeting Agenda (40.9kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 28 October 2022

Statement of Need - Version 2 (79.3kB PDF)

Stage 1 - Statement of Need

Date added: 06 October 2022

Statement of Need - Version 1 (76.2kB PDF)

Stage 1 - Statement of Need

Date added: 06 October 2022

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close