Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is 3.

Implementation of offshore Point in Space (PinS) procedures to Gas Production Rig K13A by the Netherlands

Close

Stage 4 : Update and Submit

This step has been started

Stage 4 enables the change sponsor to make any final adjustments to the airspace design ahead of submitting the final airspace change proposal to the CAA.

Documents for this proposal (7 documents)

Engagement evidence Dutch changes alignment (redacted) (2.4MB PDF)

Stage 4 - Consultation Response Document

Date added: 11 August 2025

Stage 4 ACP submission - HeliPinS Rig K13A alignment with Dutch process (481.7kB PDF)

Stage 4 - Consultation Response Document

Date added: 11 August 2025

ACP-2025-009 Timeline Confirmation (118.4kB PDF)

Stage 1 - Timeline Agreement

Date added: 21 May 2025

ACP-2025-009 Stage 1 Assessment Meeting Minutes (196.4kB PDF)

Stage 1 - Assessment Meeting Outputs

Date added: 21 May 2025

ACP-2025-009 Stage 1 Assessment Meeting Slides (655.6kB PDF)

Stage 1 - Assessment Meeting Presentation

Date added: 21 May 2025

ACP-2025-009 Stage 1 Assessment Meeting Agenda (46.7kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 21 May 2025

DAP1916 Statement of Need (365.9kB PDF)

Stage 1 - Statement of Need

Date added: 18 February 2025

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close