Purpose of this change

This proposal is for an Airspace Trial, for which a scaled airspace change process applies and a change level is not applicable.

The proposed TRA will serve as a controlled environment to demonstrate the transition from ‘accommodation’ to ‘integration’ as outlined in CAP2533. This aligns with the strategic objectives of airspace integration set forth in the CAP1711 Airspace Modernisation Strategy (AMS).

The primary objective of the trial is to validate the safe integration of BVLOS Uncrewed Aircraft Systems (UAS) with other airspace users in unsegregated Class G airspace. This will be achieved through the provision of a Traffic Service by NWI ANSP and the use of Electronic Conspicuity (EC), in conjunction with a ground-based sensor network.

Together, these systems aim to deliver a level of safety equivalent to or exceeding that of traditional visual see-and-avoid methods.

To support these objectives, StirlingX is seeking access to a suitable volume of Class G airspace for the creation of the TRA. The purpose of this BVLOS sandbox initiative is to demonstrate that, with the appropriate operational procedures and technological enablers, BVLOS operations can be safely and effectively integrated into the wider airspace environment.

Close

Stage 5 : Decide

This step has been started

Stage 5 is where the CAA reviews and assesses the final airspace change proposal, seeking further information from the change sponsor where required. Stage 5 is completed with the publication of the decision whether to approve or reject the proposal.

Documents for this proposal (11 documents)

Airspace Design (1.9MB PDF)

Stage 4 - Consultation Response Document

Date added: 13 February 2026

Consultation Pack (1.4MB PDF)

Stage 4 - Consultation Response Document

Date added: 13 February 2026

Consultation Strategy (370.9kB PDF)

Stage 4 - Consultation Response Document

Date added: 13 February 2026

Stakeholder Engagement Report (548.8kB PDF)

Stage 4 - Consultation Response Document

Date added: 13 February 2026

Airspace Change Proposal (608.1kB PDF)

Stage 4 - Consultation Response Document

Date added: 13 February 2026

Timeline Change Confirmation (112.3kB PDF)

Stage 3 - Timeline Agreement

Date added: 28 January 2026

Timeline Agreement (106.7kB PDF)

Stage 1 - Timeline Agreement

Date added: 03 October 2025

Assessment Meeting Presentation (1.1MB PDF)

Stage 1 - Assessment Meeting Presentation

Date added: 19 September 2025

Assessment Meeting Minutes (740.4kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 19 September 2025

Assessment meeting agenda (153.2kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 27 August 2025

DAP1916v2 Statement of Need (801.8kB PDF)

Stage 1 - Statement of Need

Date added: 10 July 2025