Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is 1.

This airspace change intends to modernise airspace around Glasgow Airport in order to:

- Meet the regulatory requirements for Performance Based Navigation (PBN) implementation

- Decouple existing procedures from ground based navigational aids

- Meet the intent of the UK's Airspace Modernisation Strategy

- Consider environmental and operational and benefits

Close

Consult/Engage Gateway

This step has been started

At the consult/engage gateway, the CAA completes a regulatory assessment of the change sponsor's outputs and relevant supporting evidence to determine whether the airspace change process requirements of Stage 3 have been followed.

CAA response to Consult/Engage Gateway

27/09/2024: Due to the withdrawal of Edinburgh Airport’s FASI ACP-2019-32 at the September 2024 Gateway, this ACP's Gateway has been deferred to an October 2024 Gateway to enable the ScTMA cluster to be assessed simultaneously.

28/10/2024: In accordance with CAP1616 Gateway process, the CAA is seeking clarification from the change sponsor to enable the CAA to conclude if the requirements of the Stage 3 Consult Gateway and alignment with the proposed Iteration 3 of the UK Masterplan (Scottish cluster) have been met.

Close

Documents for this proposal (54 documents)

Indicative Timeline - Sept 2024 (211.6kB PDF)

Consult/Engage Gateway - Timeline Agreement

Date added: 27 September 2024

Indicative Timeline - Sept 2023 (206.7kB PDF)

Stage 3 - Timeline Agreement

Date added: 11 September 2023

Habitats Regulations Assessment (HRA) Meeting Minutes (244.2kB PDF)

Stage 3 - Other

Date added: 18 August 2023

Indicative Timeline - April 2023 (133.3kB PDF)

Stage 3 - Timeline Agreement

Date added: 17 April 2023

Indicative Timeline - December 2022 (206.6kB PDF)

Stage 3 - Timeline Agreement

Date added: 01 December 2022

CAA Initial Options Appraisal Assessment (1.5MB PDF)

Stage 2 - Options Appraisal Assessment (Phase I - Initial)

Date added: 01 September 2022

Initial Options Appraisal - V1.4 (11.7MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 30 August 2022

Annex A - Design Principle Evaluation - V1.4 (3.9MB PDF)

Stage 2 - Design Principle Evaluation

Date added: 30 August 2022

Stage 2A - Main Document - V1.3 (5.8MB PDF)

Stage 2 - Design Options

Date added: 19 August 2022

Annex A - Design Principle Evaluation - V1.3 (4.0MB PDF)

Stage 2 - Design Principle Evaluation

Date added: 19 August 2022

Initial Options Appraisal - V1.3 (11.7MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 19 August 2022

Stage 2A Main Document - V1.2 (5.8MB PDF)

Stage 2 - Design Options

Date added: 05 August 2022

Annex A - Design Principle Evaluation V1.2 (4.9MB PDF)

Stage 2 - Design Principle Evaluation

Date added: 05 August 2022

Initial Options Appraisal - V1.2 (11.7MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 05 August 2022

Stage 2 - Change Record Document V1.0 (193.1kB PDF)

Stage 2 - Other

Date added: 29 July 2022

Stage 2A - Main Document V1.1 (8.5MB PDF)

Stage 2 - Design Options

Date added: 29 July 2022

Annex 1 - Design Principle Evaluation V1.1 (4.1MB PDF)

Stage 2 - Design Principle Evaluation

Date added: 29 July 2022

Initial Options Appraisal V1.1 (11.7MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 29 July 2022

Indicative Timeline - July 2022 (206.4kB PDF)

Stage 2 - Timeline Agreement

Date added: 05 July 2022

Develop & Assess Gateway Outcome - June 2022 (114.2kB PDF)

Develop and Assess Gateway - Gateway Decision

Date added: 27 June 2022

Indicative Timeline - June 2022 (205.9kB PDF)

Develop and Assess Gateway - Timeline Agreement

Date added: 20 June 2022

Initial Options Appraisal (V1.0) (3.6MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 30 May 2022

Stage 2B - Technical Appendix V1.0 (29.0MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 30 May 2022

Stage 2A - Main Document (5.1MB PDF)

Stage 2 - Design Options

Date added: 30 May 2022

Annex 1 - Design Principle Evaluation (8.9MB PDF)

Stage 2 - Design Principle Evaluation

Date added: 30 May 2022

Appendix A - Stakeholder List (230.6kB PDF)

Stage 2 - Engagement Evidence

Date added: 30 May 2022

Appendix B - Engagement Log (609.2kB PDF)

Stage 2 - Engagement Evidence

Date added: 30 May 2022

Appendix C - Engagement Details (Part 1 of 5) (52.1MB PDF)

Stage 2 - Engagement Evidence

Date added: 30 May 2022

Appendix C - Engagement Details (Part 2 of 5) (52.2MB PDF)

Stage 2 - Engagement Evidence

Date added: 30 May 2022

Appendix C - Engagement Details (Part 3 of 5) (52.0MB PDF)

Stage 2 - Engagement Evidence

Date added: 30 May 2022

Appendix C - Engagement Details (Part 4 of 5) (51.6MB PDF)

Stage 2 - Engagement Evidence

Date added: 30 May 2022

Appendix C - Engagement Details (Part 5 of 5) (33.6MB PDF)

Stage 2 - Engagement Evidence

Date added: 30 May 2022

Appendix D - Stakeholder Feedback (320.2kB PDF)

Stage 2 - Design Options Engagement Evidence

Date added: 30 May 2022

Appendix E - Stakeholder Resources (993.9kB PDF)

Stage 2 - Design Options Engagement Evidence

Date added: 30 May 2022

Appendix G - GA & Airlines Stakeholder Presentation (7.7MB PDF)

Stage 2 - Design Options Engagement Evidence

Date added: 30 May 2022

Indicative Timeline - July 2021 (207.1kB PDF)

Stage 2 - Timeline Agreement

Date added: 09 July 2021

Appendix C:Stakeholder feedback V2 (11.3MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 12 December 2019

Appendix A: Engagement Log V3 (1.3MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 12 December 2019

Report on airspace design principles engagement V3 (900.1kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 12 December 2019

Appendix A: Engagement Log V2 (2.1MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 12 November 2019

Report on airspace design principles engagement V2 (896.8kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 12 November 2019

Appendix D: Feedback on engagement process (2.0MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 05 November 2019

Appendix C:Stakeholder feedback (9.4MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 05 November 2019

Appendix B: Engagement Material (15.9MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 05 November 2019

Appendix A: Engagement Log (1.0MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 05 November 2019

Report on airspace design principles engagement (691.3kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 05 November 2019

Stage 1A Assessment meeting brief (606.5kB PDF)

Stage 1 - Other

Date added: 01 July 2019

Stage 1A Assessment meeting minutes (222.4kB PDF)

Stage 1 - Assessment Meeting Minutes

Date added: 01 July 2019

Stage 1A Assessment meeting agenda (34.7kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 12 June 2019

Statement of Need (V2) (107.7kB PDF)

Stage 1 - Statement of Need

Date added: 12 June 2019

Statement of Need (V1) (53.8kB PDF)

Stage 1 - Statement of Need

Date added: 12 June 2019

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close