Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is TBC.

NATS seeks to mitigate high controller workload due to airspace congestion in commonly occurring traffic scenarios, to the north of the London TMA. Arrival flow convergence in this region causes congestion and ATC complexity. This has the potential to affect safety if left unresolved as traffic levels increase, and NATS intends to address the issue before safety has the potential to be affected. A reduction in congestion and complexity would lead to ATC workload reduction and further improve safety in the region.

Close

Define Gateway

This step has been started

At the Define Gateway, the CAA completes a regulatory assessment of the change sponsor’s outputs and relevant supporting evidence to determine whether the airspace change process requirements of Stage 1 have been followed.

Documents for this proposal (12 documents)

OFJES Stage 2 Checklist (181.4kB PDF)

Stage 1 - Submission Checklist

Date added: 08 August 2025

OFJES Stage 2 Engagement Evidence (8.5MB PDF)

Stage 1 - Engagement Evidence

Date added: 08 August 2025

OFJES Stage 2 Develop and Assess (696.6kB PDF)

Stage 1 - Other

Date added: 08 August 2025

OFJES Stage 1 Checklist (203.9kB PDF)

Stage 1 - Other

Date added: 08 August 2025

OFJES Stage 1 Design Principles Engagement Evidence (2.3MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 08 August 2025

OFJES Stage 1 Design Principles Document (1.0MB PDF)

Stage 1 - Design Principles

Date added: 08 August 2025

OFJES Timeline Agreed (206.6kB PDF)

Stage 1 - Timeline Agreement

Date added: 29 July 2025

OFJES Assessment Meeting Minutes (310.8kB PDF)

Stage 1 - Assessment Meeting Outputs

Date added: 29 July 2025

OFJES Assessment Meeting Presentation (1.1MB PDF)

Stage 1 - Assessment Meeting Presentation

Date added: 29 July 2025

Assessment Meeting Agenda (97.7kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 03 July 2025

ACP-2025-023 Statement of Need 27 May 2025 (70.1kB PDF)

Stage 1 - Statement of Need

Date added: 27 May 2025

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close