Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is 1.

This proposal is for a Permanent change to the notified airspace design, and the change level is TBC. The detailed process requirements are published in Part 1 of CAP 1616.

Close

Stage 3 : Consultation/Engagement Preparation

This step has been started

At the beginning of Stage 3 the change sponsor prepares a strategy and draft materials and submits them to the CAA, along with the full options appraisal.

CAA response to Stage 3

13/12/2023 - The revised airspace change process (CAP 1616, Version 5) will be implemented on 02 January 2024. This ACP will remain a Level 1 and will need to follow the process requirements as set out in CAP 1616 Version 5.

Close

Documents for this proposal (31 documents)

CAA Regulatory Meeting Minutes - 9 Mar 23 (Abridged) (46.4kB PDF)

Stage 3 - Other

Date added: 26 April 2023

Initial Options Appraisal Assessment (338.4kB PDF)

Stage 2 - Options Appraisal Assessment (Phase I - Initial)

Date added: 29 November 2022

RAF Northolt Step 2B Appendix B - Technical Appendix V1.0 (6.6MB PDF)

Stage 2 - Other

Date added: 28 October 2022

RAF Northolt Step 2B Initial Options Appraisal V1.0 (3.2MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 28 October 2022

RAF Northolt Step 2A Appendix F - Stakeholder Feedback V1.0 (Redacted) (4.6MB PDF)

Stage 2 - Engagement Evidence

Date added: 28 October 2022

RAF Northolt Step 2A Appendix C - Stakeholder Engagement Log V1.0 (Redacted) (762.5kB PDF)

Stage 2 - Engagement Evidence

Date added: 28 October 2022

RAF Northolt Step 2A Appendix B - List of Stakeholders V1.0 (Redacted) (864.7kB PDF)

Stage 2 - Engagement Evidence

Date added: 28 October 2022

RAF Northolt Step 2A Appendix A - Design Principle Evaluation V1.0 (7.3MB PDF)

Stage 2 - Design Principle Evaluation

Date added: 28 October 2022

RAF Northolt Step 2A Options Development V1.0 (4.1MB PDF)

Stage 2 - Design Options

Date added: 28 October 2022

Indicative Timeline - January 2022 (208.7kB PDF)

Stage 2 - Timeline Agreement

Date added: 25 January 2022

RAF Northolt ACP Restart Letter (73.5kB PDF)

Stage 2 - Engagement Evidence

Date added: 22 July 2021

Indicative Timeline - July 2021 (206.7kB PDF)

Stage 2 - Timeline Agreement

Date added: 09 July 2021

Annex D - Stakeholder Feedback (7.9MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 22 June 2021

Annex C - Stakeholder Engagement Correspondence (2.0MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 22 June 2021

Annex A - Stakeholders in the RAF Northolt Airspace Change Proposal (174.5kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 22 June 2021

RAF Northolt ACP Stage 1B Submission (129.5kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 22 June 2021

Letter to CAA from Sponsor Airspace Modernisation (164.2kB PDF)

Stage 2 - Other

Date added: 17 January 2020

Letter to Sponsor from CAA Airspace Modernisation (365.1kB PDF)

Stage 2 - Other

Date added: 05 August 2019

Enclosure 1 - Air Space Strategy Research Report_S (722.9kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 28 June 2019

Annex E - Rationale Behind RAF Northolt Design Pri (62.3kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 28 June 2019

Annex B - Stakeholder Engagement Timeline (74.6kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 28 June 2019

Assessment Meeting Presentation (334.3kB PDF)

Stage 1 - Other

Date added: 25 April 2019

Assessment Meeting Minutes (267.3kB PDF)

Stage 1 - Assessment Meeting Minutes

Date added: 14 February 2019

Assessment Meeting Agenda (26.0kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 21 January 2019

Statement of Need (651.5kB PDF)

Stage 1 - Statement of Need

Date added: 09 October 2018

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close