This proposal is for a Permanent change to the notified airspace design, and the change level is 1.

This proposal is for a Permanent change to the notified airspace design, and the change level is TBC. The detailed process requirements are published in Part 1 of CAP 1616.

Close

Stage 3 : Consultation/Engagement Preparation

This step has been started

At the beginning of Stage 3 the change sponsor prepares a strategy and draft materials and submits them to the CAA, along with the full options appraisal.

13/12/2023 - The revised airspace change process (CAP 1616, Version 5) will be implemented on 02 January 2024. This ACP will remain a Level 1 and will need to follow the process requirements as set out in CAP 1616 Version 5.

Close

CAA Regulatory Meeting Minutes - 9 Mar 23 (Abridged) (46.4kB PDF)

Stage 3 - Other

Date added: 26 April 2023

Initial Options Appraisal Assessment (338.4kB PDF)

Stage 2 - Options Appraisal Assessment (Phase I - Initial)

Date added: 29 November 2022

RAF Northolt Step 2B Appendix B - Technical Appendix V1.0 (6.6MB PDF)

Stage 2 - Other

Date added: 28 October 2022

RAF Northolt Step 2B Initial Options Appraisal V1.0 (3.2MB PDF)

Stage 2 - Options Appraisal (Phase I - Initial)

Date added: 28 October 2022

RAF Northolt Step 2A Appendix F - Stakeholder Feedback V1.0 (Redacted) (4.6MB PDF)

Stage 2 - Engagement Evidence

Date added: 28 October 2022

RAF Northolt Step 2A Appendix C - Stakeholder Engagement Log V1.0 (Redacted) (762.5kB PDF)

Stage 2 - Engagement Evidence

Date added: 28 October 2022

RAF Northolt Step 2A Appendix B - List of Stakeholders V1.0 (Redacted) (864.7kB PDF)

Stage 2 - Engagement Evidence

Date added: 28 October 2022

RAF Northolt Step 2A Appendix A - Design Principle Evaluation V1.0 (7.3MB PDF)

Stage 2 - Design Principle Evaluation

Date added: 28 October 2022

RAF Northolt Step 2A Options Development V1.0 (4.1MB PDF)

Stage 2 - Design Options

Date added: 28 October 2022

Indicative Timeline - January 2022 (208.7kB PDF)

Stage 2 - Timeline Agreement

Date added: 25 January 2022

RAF Northolt ACP Restart Letter (73.5kB PDF)

Stage 2 - Engagement Evidence

Date added: 22 July 2021

Indicative Timeline - July 2021 (206.7kB PDF)

Stage 2 - Timeline Agreement

Date added: 09 July 2021

Annex D - Stakeholder Feedback (7.9MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 22 June 2021

Annex C - Stakeholder Engagement Correspondence (2.0MB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 22 June 2021

Annex A - Stakeholders in the RAF Northolt Airspace Change Proposal (174.5kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 22 June 2021

RAF Northolt ACP Stage 1B Submission (129.5kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 22 June 2021

Letter to CAA from Sponsor Airspace Modernisation (164.2kB PDF)

Stage 2 - Other

Date added: 17 January 2020

Letter to Sponsor from CAA Airspace Modernisation (365.1kB PDF)

Stage 2 - Other

Date added: 05 August 2019

Enclosure 1 - Air Space Strategy Research Report_S (722.9kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 28 June 2019

Annex E - Rationale Behind RAF Northolt Design Pri (62.3kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 28 June 2019

Annex B - Stakeholder Engagement Timeline (74.6kB PDF)

Stage 1 - Design Principles Engagement Evidence

Date added: 28 June 2019

Assessment Meeting Presentation (334.3kB PDF)

Stage 1 - Other

Date added: 25 April 2019

Assessment Meeting Minutes (267.3kB PDF)

Stage 1 - Assessment Meeting Minutes

Date added: 14 February 2019

Assessment Meeting Agenda (26.0kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 21 January 2019

Statement of Need (651.5kB PDF)

Stage 1 - Statement of Need

Date added: 09 October 2018

Close

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close