Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is TBC.

The proposal seeks to address the opportunity of introducing cleaner, quieter, new generation aircraft at London City Airport (EGLC) by implementing RNP AR procedures with non-standard approach angles rather than through aircraft steep-approach certification. This would deliver complimentary benefits, in advance of changes under the wider FASI

airspace change programme, by modernising approach procedures to address airspace demand and secure the most efficient use of airspace, whilst maintaining existing movement limits and complying with noise and operational restrictions in the surrounding urban area.

New RNP AR procedures will improve access to a wider range of modern aircraft ensuring the expeditious flow of traffic in a safe and sustainable way, in line with the strategic objectives of the Airspace Modernisation Strategy. Similarly, the additional navigational accuracy, integrity, and functional capabilities offered by RNPAR are likely to offer significant operational advantages in the constrained obstacle environment at EGLC whilst preserving or improving safety of operation.

Environmentally, the proposal aims to limit and, where possible, reduce the

number of people significantly affected by adverse impacts from aircraft noise by introducing quieter aircraft on existing tracks over the ground. The proposal also seeks to balance economic benefits with the need to maximise use of the airport’s existing and future infrastructure while preserving ground-based approach procedures for the current fleet.

Close

Stage 3 : Consultation/Engagement Preparation

This step has been started

At the beginning of Stage 3 the change sponsor prepares a strategy and draft materials and submits them to the CAA, along with the full options appraisal.

Documents for this proposal (14 documents)

CAA Initial Options Appraisal Assessment (1.9MB PDF)

Stage 2 - Options Appraisal Assessment (Phase I - Initial)

Date added: 02 September 2025

Stage 2 Develop and Assess V1.1 (10.9MB PDF)

Stage 2 - Design Options

Date added: 02 September 2025

Agreed Timeline Proposal Redacted (207.3kB PDF)

Develop and Assess Gateway - Timeline Agreement

Date added: 28 August 2025

Stage 2 Checklist (167.3kB PDF)

Stage 2 - Submission Checklist

Date added: 14 August 2025

Stage 2 Develop and Assess V1 (10.8MB PDF)

Stage 2 - Design Options

Date added: 14 August 2025

Engagement Workshop Slides (25.0MB PDF)

Stage 2 - Engagement Material

Date added: 13 August 2025

Stage 1 Submission Checklist (194.3kB PDF)

Stage 1 - Submission Checklist

Date added: 23 May 2025

Stage 1 Define: Design Principles (5.3MB PDF)

Define Gateway - Engagement Evidence

Date added: 13 May 2025

Assessment Meeting Slides (Redacted) (12.0MB PDF)

Stage 1 - Assessment Meeting Presentation

Date added: 29 April 2025

Agreed Initial Timeline Proposal (Redacted) (207.1kB PDF)

Stage 1 - Timeline Agreement

Date added: 29 April 2025

Assessment Meeting Minutes (Redacted) (387.4kB PDF)

Stage 1 - Assessment Meeting Outputs

Date added: 29 April 2025

Statement of Need (Redacted)_V2 (1.5MB PDF)

Stage 1 - Statement of Need

Date added: 25 March 2025

Assessment Meeting Agenda (157.9kB PDF)

Stage 1 - Assessment Meeting Agenda

Date added: 06 March 2025

Statement of Need (Redacted) (806.3kB PDF)

Stage 1 - Statement of Need

Date added: 24 January 2025

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close