Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is M1.

Air Command, on behalf of the Ministry of Defence, has an obligation to provide relevant tactical collective training to its combat and combat support forces to ensure UK Forces are correctly prepared to defend UK interests in line with the UK Defence Strategy. An

appropriate airspace that can safely facilitate exercising large forces of modern and future air platforms , in a representative combat

environment is required to meet this need.

Core military requirements :

Minimising the risk of MAC to the maximum extent whilst enabling;

Full tactical employment of aircraft and weapons capability

• Supersonic flight and rapid height changes

• Overflight and loiter of rural overland areas

• Use high and low altitude activity concurrently

• Representative employment ranges of simulated air-air and air-surface weapons

Representative operational numbers

Ability to oppose from ground and air simultaneously

Contested in electromagnetic environment

Changing external circumstances make current solutions untenable to deliver the required needs of Defence. Alternate airspace

would diminish required training objectives for Defence and increase the risk to all air users to an unpalatable level. This change

request will be, in part, informed by the associated trial data received through ACP-2020 -042, which is running concurrently.

Close

Step 7 : Post-Implementation Review

This step has been started

At the Post-Implementation Review Step, the CAA reviews how the airspace change has performed, including whether anticipated impacts and benefits in the original proposal and decision have been delivered.

Documents for this proposal (67 documents)

ACP-2020-026 Conditions Sponsor Update (69.0kB PDF)

Step 6 - Engagement Evidence

Date added: 25 March 2024

WebTag workbook (55 activations) (169.7kB PDF)

Step 6 - Engagement Evidence

Date added: 25 March 2024

FCA Conditions - CAA Response (110.1kB PDF)

Step 6 - Other

Date added: 20 March 2024

CAA Decision Log_Redacted (373.5kB PDF)

Decide Gateway - Gateway Decision

Date added: 12 December 2023

CAA Stage 5 Consultation Assessment_Redacted (281.9kB PDF)

Decide Gateway - Other

Date added: 12 December 2023

CAA ATM Safety Review Letter of Acceptance (114.7kB PDF)

Decide Gateway - Other

Date added: 11 December 2023

CAA Final Options Appraisal Assessment_Redacted (978.2kB PDF)

Decide Gateway - Other

Date added: 11 December 2023

CAA Environmental Assessment_Redacted (446.0kB PDF)

Decide Gateway - Other

Date added: 11 December 2023

CAA Operational Assessment_Redacted (475.1kB PDF)

Decide Gateway - Other

Date added: 11 December 2023

Final Submission - Stage 4B V2 (1.4MB PDF)

Step 5a - Other

Date added: 19 October 2023

Options Appraisal (Phase III - Final) V1.1 (1.5MB PDF)

Step 5a - Other

Date added: 19 October 2023

Stage 4B Supplementary Information (613.8kB PDF)

Step 5a - Other

Date added: 19 October 2023

Request for Supplementary Information (173.6kB PDF)

Step 5a - Other

Date added: 19 October 2023

Final Submission - Stage 4B (1.4MB PDF)

Step 4b - Airspace Change Proposal

Date added: 24 August 2023

Annex E - Final Submission (182.9kB PDF)

Step 4b - Airspace Change Proposal

Date added: 02 August 2023

Annex D - Final Submission (177.8kB PDF)

Step 4b - Airspace Change Proposal

Date added: 02 August 2023

Annex D - Final Submission (179.3kB PDF)

Step 4b - Airspace Change Proposal

Date added: 02 August 2023

Annex C - Final Submission (504.4kB PDF)

Step 4b - Airspace Change Proposal

Date added: 02 August 2023

Annex B - Final Submission (24.4kB PDF)

Step 4b - Airspace Change Proposal

Date added: 02 August 2023

Annex A - Final Submission (193.4kB PDF)

Step 4b - Airspace Change Proposal

Date added: 02 August 2023

Options Appraisal (Phase III - Final) (1.5MB PDF)

Step 4a - Consultation Response Document

Date added: 02 August 2023

Consultation Log (30.0kB PDF)

Step 3d - Categorisation of Responses

Date added: 02 August 2023

Consultation Review Redacted - Stage 4A (2.7MB PDF)

Step 4a - Consultation Response Document

Date added: 01 August 2023

Categorisation of Responses Table (152.3kB PDF)

Step 3d - Categorisation of Responses

Date added: 01 August 2023

Categorisation of Responses (99.3kB PDF)

Step 3d - Categorisation of Responses

Date added: 01 August 2023

Consultation Document - Stage 3 (1.7MB PDF)

Step 3c - Other

Date added: 26 May 2023

Options Appraisal (Phase II - Full) (1.6MB PDF)

Consult Gateway - Other

Date added: 27 April 2023

Consultation Strategy - Stage 3 (449.5kB PDF)

Consult Gateway - Other

Date added: 27 April 2023

Full Options Appraisal Assessment (288.5kB PDF)

Step 3b - Options Appraisal Assessment (Phase II - Full)

Date added: 03 February 2023

Timeline Agreement (120.1kB PDF)

Consult Gateway - Engagement Evidence

Date added: 20 December 2022

Stage 3 Consult Gateway Outcome - November 2022 (108.1kB PDF)

Consult Gateway - Gateway Decision

Date added: 29 November 2022

Indicative Timeline - August 2022 (179.8kB PDF)

Step 3a - Timeline Agreement

Date added: 22 August 2022

Initial Options Appraisal Assessment (1.2MB PDF)

Develop & Assess Gateway - Other

Date added: 17 March 2022

20220315-2b-v3AL1 (322.0kB PDF)

Develop & Assess Gateway - Other

Date added: 15 March 2022

20220315-2a-v3AL1 (1.2MB PDF)

Develop & Assess Gateway - Other

Date added: 15 March 2022

Engagement emails - redacted (845.2kB PDF)

Develop & Assess Gateway - Engagement Evidence

Date added: 22 February 2022

Options Appraisal v2 (1.6MB PDF)

Step 2b - Options Appraisal (Phase I - Initial)

Date added: 21 February 2022

Design Principles Evaluation v2 (500.1kB PDF)

Step 2a - Design Principle Evaluation

Date added: 21 February 2022

Options Development v2 (6.0MB PDF)

Step 2a - Design Options

Date added: 21 February 2022

Timeline Agreement - Feb 2022 (179.5kB PDF)

Develop & Assess Gateway - Timeline Agreement

Date added: 09 February 2022

Develop & Assess Gateway Outcome - 17 December 2021 (175.1kB PDF)

Develop & Assess Gateway - Gateway Decision

Date added: 21 December 2021

NIA Mtg minutes and Jet 2 response (532.9kB PDF)

Develop & Assess Gateway - Engagement Evidence

Date added: 09 December 2021

NIA Meeting minutes (143.6kB PDF)

Develop & Assess Gateway - Engagement Evidence

Date added: 09 December 2021

Engagement Summary (809.6kB PDF)

Step 2a - Engagement Evidence

Date added: 08 December 2021

Revised timeline (179.0kB PDF)

Step 2b - Timeline Agreement

Date added: 07 December 2021

Options Appraisal (141.8kB PDF)

Step 2b - Options Appraisal (Phase I - Initial)

Date added: 06 December 2021

Design Principles Evaluation (186.5kB PDF)

Step 2a - Design Principle Evaluation

Date added: 06 December 2021

Options Development (618.8kB PDF)

Step 2a - Design Options

Date added: 06 December 2021

Email to stakeholders (59.9kB PDF)

Step 2a - Engagement Evidence

Date added: 10 September 2021

Stakeholder emails (758.5kB PDF)

Step 2a - Engagement Evidence

Date added: 10 September 2021

Options Appraisal (134.7kB PDF)

Step 2b - Options Appraisal (Phase I - Initial)

Date added: 10 September 2021

Design principles evaluation (208.4kB PDF)

Step 2a - Design Principle Evaluation

Date added: 09 September 2021

Options Development with stakeholder feedback (485.8kB PDF)

Step 2a - Design Options

Date added: 09 September 2021

Options Development (556.6kB PDF)

Step 2a - Design Options

Date added: 08 September 2021

Agreed revised timeline (183.8kB PDF)

Step 2a - Timeline Agreement

Date added: 16 July 2021

Assessment Meeting Minutes-REDACTED JUN 21 (163.7kB PDF)

Step 1a - Assessment Meeting Minutes

Date added: 22 June 2021

Statement of Need v3-REDACTED in JUN 21 (75.6kB PDF)

Step 1a - Statement of Need

Date added: 22 June 2021

Statement of Need v2 - Update-REDACTED (71.7kB PDF)

Step 1a - Statement of Need

Date added: 22 June 2021

ACP-2020-026 Stage 1B Design Principles Submission Version 2.0 (257.6kB PDF)

Step 1b - Design Principles

Date added: 05 May 2021

ACP-2020-026 Stage 1B Design Principles Engagement Evidence (3.3MB PDF)

Step 1b - Design Principles Engagement Evidence

Date added: 14 April 2021

ACP-2020-026 Stage 1B Design Principles Submission (233.0kB PDF)

Step 1b - Design Principles

Date added: 14 April 2021

Engagement Covering Email (284.1kB PDF)

Step 1b - Engagement Evidence

Date added: 29 March 2021

Engagement Letter (182.1kB PDF)

Step 1b - Engagement Evidence

Date added: 29 March 2021

Assessment Meeting Slides (1.1MB PDF)

Step 1a - Other

Date added: 07 January 2021

Assessment of contextual changes (110.5kB PDF)

Step 1a - Other

Date added: 15 December 2020

ACP-2020-026 Agenda (564.9kB PDF)

Step 1a - Assessment Meeting Agenda

Date added: 15 December 2020

Statement of Need v1 (487.8kB PDF)

Step 1a - Statement of Need

Date added: 18 June 2020

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close