Purpose of this change

This proposal is for a Permanent change to the notified airspace design, and the change level is 1.

This change proposal is sponsored jointly by NATS and London Luton Airport. The proposed changes make improvements to the arrivals to Luton Airport to address latent risk identified in the TC Essex Sector.

Close

Step 7 : Post-Implementation Review

This step has been started

At the Post-Implementation Review Step, the CAA reviews how the airspace change has performed, including whether anticipated impacts and benefits in the original proposal and decision have been delivered.

CAA response to Step 7

The CAA received a request from a relevant stakeholder, to extend the data collection period for informing the PIR of ACP2018-65. Following consideration of the request and in accordance with CAP1616 Para 290, the CAA has asked that NATS-LLA extend the data collection period until 22 Sep 23 to inform the PIR analysis. The CAA believes that this extension will provide a more representative data set.

Close

Documents for this proposal (78 documents)

NATS-LLA PIR Data Collection Statement (203.1kB PDF)

Step 7 - PIR Data Requirements

Date added: 12 April 2022

Post Implementation Review Data Request (5.2MB PDF)

Step 7 - PIR Data Requirements

Date added: 08 March 2022

Stage 5 CAA Operational Assessment (4.1MB PDF)

Step 5b - Operational Assessment

Date added: 10 December 2021

Stage 5 CAA Environmental Assessment (24.7MB PDF)

Step 5b - Environmental Assessment

Date added: 10 December 2021

Stage 5 CAA Final Options Appraisal Assessment (1.8MB PDF)

Step 5b - Options Appraisal Assessment (Phase III - Final)

Date added: 10 December 2021

Stage 5 CAA Consultation Assessment (15.0MB PDF)

Step 5b - Consultation Assessment

Date added: 10 December 2021

Stage 5 ATM Safety Review CAA Letter of Acceptance (305.3kB PDF)

Step 5b - Final Regulatory Decision

Date added: 10 December 2021

Public Evidence Session Summary and CAA Response (138.0kB PDF)

Step 5b - Final Regulatory Decision

Date added: 10 December 2021

SAIP AD6 Decision Document (705.6kB PDF)

Step 5b - Final Regulatory Decision

Date added: 10 December 2021

SAIP AD6 Decision - Short Form - 24th November 2021 (133.4kB PDF)

Step 5b - Final Regulatory Decision

Date added: 25 November 2021

SAIP AD6 Decision Statement (87.4kB PDF)

Step 5b - Final Regulatory Decision

Date added: 24 November 2021

IFP Technical Meeting Minutes Redacted 12Nov21 (144.3kB PDF)

Step 5b - Other

Date added: 19 November 2021

Clarifications Q&A additional 8 (224.7kB PDF)

Step 5b - Other

Date added: 17 November 2021

Letter to CAA on London Luton Airport Call-in Request - Redacted (139.9kB PDF)

Step 5b - Secretary of State Call-In Request Assessment

Date added: 15 November 2021

Clarifications Q&A additional 7 (257.3kB PDF)

Step 5a - Other

Date added: 11 November 2021

Clarifications Q&A additional 6 (190.9kB PDF)

Step 5a - Other

Date added: 10 November 2021

Clarifications Q&A additional 5 (271.6kB PDF)

Step 5a - Other

Date added: 09 November 2021

Tech Map UPDATED 1A-i (20.6MB PDF)

Step 5a - Other

Date added: 05 November 2021

Clarifications Q&A additional 4 (254.6kB PDF)

Step 5a - Other

Date added: 05 November 2021

Clarifications Q&A additional 3 (129.5kB PDF)

Step 5a - Other

Date added: 02 November 2021

Clarifications Q&A additional (273.3kB PDF)

Step 5a - Other

Date added: 20 October 2021

PES Transcript - CAP2263 - removal of incorrect metadata (641.0kB PDF)

Step 5a - Public Evidence Session Transcript

Date added: 18 October 2021

IFP Meeting Minutes Redacted (79.5kB PDF)

Step 3b - Other

Date added: 24 September 2021

Clarifications Q&A (501.0kB PDF)

Step 5a - Other

Date added: 10 September 2021

PES Executive Summary v1.0 (3.4MB PDF)

Step 5a - Executive Summary of Airspace Change Proposal

Date added: 07 September 2021

PES Map 4A(ii) v2.0 Final Design Op1A Technical Map (2.7MB PDF)

Step 4a - Other

Date added: 07 September 2021

About Portal Document Hyperlinks and Dates (259.5kB PDF)

Step 4b - Other

Date added: 05 July 2021

Step 3D Technical Compliance Supplement (Categorisation List) Issue 2.1 (1.0MB PDF)

Step 3d - Categorisation of Responses

Date added: 05 July 2021

4B Airspace Change Proposal Issue 1.0 (23.1MB PDF)

Step 4b - Airspace Change Proposal

Date added: 05 July 2021

4A(iii) LLA Arrivals Final Options Appraisal Issue 1.0 (1.3MB PDF)

Step 4a - Options Appraisal (Phase III - Final)

Date added: 05 July 2021

4A(i) Consultation Response Document Issue 1.0 (28.1MB PDF)

Step 4a - Consultation Response Document

Date added: 05 July 2021

Consultation and Engagement Evidence Examples (15.9MB PDF)

Step 4b - Engagement Evidence

Date added: 01 July 2021

4A(ii) Final Design Option 1A Technical Map Issue 1.0 (27.2MB PDF)

Step 4a - Consultation Response Document

Date added: 25 June 2021

Step 3D Technical Compliance Supplement (Categorisation List) Issue 2 (1.2MB PDF)

Step 3d - Categorisation of Responses

Date added: 25 June 2021

Step 3D Technical Compliance Supplement (Categorisation List) (1.3MB PDF)

Step 3d - Categorisation of Responses

Date added: 11 June 2021

Step 3D Consultation Feedback Report 1.0 (17.0MB PDF)

Step 3d - Categorisation of Responses

Date added: 10 June 2021

Consultation Strategy (1.4MB PDF)

Step 3b - Consultation Strategy

Date added: 24 September 2020

First Consult Gateway Outcome (135.8kB PDF)

Consult Gateway - Gateway Decision

Date added: 24 September 2020

Full Options Appraisal (3.5MB PDF)

Step 3b - Options Appraisal (Phase II - Full)

Date added: 23 September 2020

Full Options Appraisal Assessment (8.0MB PDF)

Step 3b - Options Appraisal Assessment (Phase II - Full)

Date added: 08 September 2020

Project timeline amendment (135.3kB PDF)

Step 3a - Airspace change extension justification 

Date added: 11 June 2020

Stage 3 Timeline Update (52.1kB PDF)

Step 3a - Airspace change extension justification 

Date added: 05 February 2020

CAA Initial Options Appraisal Assessment (334.2kB PDF)

Develop & Assess Gateway - CAA Options Appraisal Assessment (Phase I - Initial)

Date added: 02 December 2019

Step2A(ii) DesPrinEval (print) Clarity p4 p5 (744.9kB PDF)

Step 2a - Design Principle Evaluation

Date added: 20 November 2019

Step2A(ii) DesPrinEval (screen) Clarity p4 p5 (740.1kB PDF)

Step 2a - Design Principle Evaluation

Date added: 20 November 2019

Step2A(ii) DesignPrincipleEval (print) Clarity p4 (749.9kB PDF)

Step 2a - Design Principle Evaluation

Date added: 15 November 2019

Step2A(ii) DesignPrincipleEval (screen) Clarity p4 (745.1kB PDF)

Step 2a - Design Principle Evaluation

Date added: 15 November 2019

Step 2B Initial Options Appraisal tech appendix (8.1MB PDF)

Step 2b - Options Appraisal (Phase I - Initial)

Date added: 15 November 2019

Step 2B Initial Options Appraisal main doc (613.6kB PDF)

Step 2b - Options Appraisal (Phase I - Initial)

Date added: 15 November 2019

Step2A(i)DesignOptions Print Annex 6 clarified (6.6MB PDF)

Step 2a - Design Options

Date added: 14 November 2019

Step2A(i)DesignOptions Screen Annex 6 clarified (6.7MB PDF)

Step 2a - Design Options

Date added: 14 November 2019

Example Engagement Presentation (4.8MB PDF)

Step 2a - Additional meeting minutes

Date added: 07 November 2019

Step 2A (ii) Design Principle Evaluation (print) (748.3kB PDF)

Step 2a - Design Principle Evaluation

Date added: 07 November 2019

Step 2A (ii) Design Principle Evaluation (screen) (743.6kB PDF)

Step 2a - Design Principle Evaluation

Date added: 07 November 2019

Step 2A (i) Design Options (suitable for printing) (6.7MB PDF)

Step 2a - Design Options

Date added: 07 November 2019

Step 2A (i) Design Options (6.7MB PDF)

Step 2a - Design Options

Date added: 07 November 2019

Timeline update (96.9kB PDF)

Step 2a - Airspace change extension justification 

Date added: 16 September 2019

Step 1B Design Principles v1.4 DPs given ref nums (538.5kB PDF)

Step 1b - Design Principles Engagement Evidence

Date added: 19 June 2019

Step 1B Design Principles v1.3 add'l clarification (536.2kB PDF)

Step 1b - Design Principles Engagement Evidence

Date added: 30 April 2019

Step 1B Design Principles v1.2 More Clarification (536.4kB PDF)

Step 1b - Design Principles Engagement Evidence

Date added: 29 April 2019

Stage 2 Timeline Amendment (38.7kB PDF)

Step 1a - Other

Date added: 15 April 2019

Revised SoN (ref. 2781), 2nd update, now V3 (1.0MB PDF)

Step 1a - Statement of Need

Date added: 12 April 2019

Step 1B Design Principles v1.1 - clarifying text (534.1kB PDF)

Step 1b - Design Principles Engagement Evidence

Date added: 12 April 2019

Step 1B Design Principles (531.1kB PDF)

Step 1b - Design Principles Engagement Evidence

Date added: 11 April 2019

Stage 1 Timeline Amendment (37.6kB PDF)

Step 1a - Other

Date added: 14 March 2019

Stage 1 Assessment Meeting Minutes (330.0kB PDF)

Step 1a - Assessment Meeting Minutes

Date added: 14 February 2019

Assessment Meeting Agenda (173.9kB PDF)

Step 1a - Assessment Meeting Agenda

Date added: 09 January 2019

Rationale for Revised SoN (32.4kB PDF)

Step 1a - Other

Date added: 02 January 2019

Revised Statement of Need (ref. 2401) (1.0MB PDF)

Step 1a - Statement of Need

Date added: 02 January 2019

Statement of Need (501.6kB PDF)

Step 1a - Statement of Need

Date added: 09 October 2018

Close

Potentially affected area

This is the area which may be affected by this airspace change depending on its development. This area may change as the proposal is developed.

Close